Construction management
4D/5D construction simulation
We make construction sequences visible and cost over time plannable.
The problem
Only specialists read schedules and cost plans. Clashes between trades, logistics and liquidity therefore often surface only once work on site has begun.
What we do
We link your building model with schedule and cost. The construction sequence becomes visible, verifiable and economically measurable before work starts on site.
- 4D construction simulation based on IFC models
- Visualisation of variants, logistics and site setup
- 5D cost curves and cash-flow plans
- Presentation for clients, authorities and subcontractors
What you get
- Understand the sequence without reading schedules
- Detect spatial and temporal conflicts before construction
- Keep cost and liquidity in view over the entire duration